The equipment is delivered in a 20ft HC transport container. The equipment is placed in specially designed interior racks, which makes the transport and delivery very cost-efficient, and also ensures the customer receives the system ready to work. For quick and safe handling of the equipment onsite, the transport rack can be pulled directly out of the container ensuring faster loading and unloading times.